Vertical Horizons

Research and Musings around the amusement park world.

Monthly Archives: June 2011

Chinese SLC Guide

With the rapid expansion of the Chinese amusement industry several new companies have tried their hand at making their own version of the worlds most common inverted coaster the Vekoma SLC. In some instances literally just copying layouts from each other.

So today I have added a quick guide to the many types of Chinese Suspended Looping Coaster which have popped up over the last few years. To access it click the tab at the top of this page of the image below.



http://vhcoasters.com/chinese-slc-guide/

China Dinosaur Park takes delivery of 4D Track

The long awaited 3rd S&S 4th dimension coaster has started arriving at China Dinosaur Park. The ride looks to have a similar layout to the existing 4D’s and will stand 79m tall. It looks like it will have a very similar colour scheme to Eejanaika at Fuji-Q Highlands in Japan.

Bright Red Track Arrives

Source: NDDaily

Construction of Yamaha Racing Coaster continues.

The new Premier launched coaster at Trans Studio Makassar in Indonesia has been given the name “Yamaha Racing Coaster“. On top of that construction has almost finished and you can find a new shot of the almost complete ride below.

Source: Skyscraper City

Triumph Kingdom starts construction.

A lot of Chinese news sites have recently started reporting on a new park that has begun construction in the Wuqing District of China.

The park translates roughly as Triumph Kingdom and according to news articles will feature three new roller coasters. These are listed as a “U Shaped rocket launcher, Spinning Coaster & Flying Coaster”. Articles also mention at least two of the coasters being will be sourced in the USA and Switzerland.

I will let you all draw your own conclusions from that but you can find some of the (small) concept artwork below.

Source:
http://news.dichan.sina.com.cn/tj/2011/03/28/295142.html

According to the above article construction is expected to finish in October which seems an awfully short time scale, however as always more info as and when it arrives.

Mountain Peak Complete

Follow

Get every new post delivered to your Inbox.